Monday, January 3, 2011
【School】 elevator inspection and weak requirements --- Power By 【China】 weak home network.
<br> when many people are now buying the elevator acceptance of the concept of the elevator is not very clear, we are dedicated to elaborate on this with some of the elements related to the elevator inspection: 1. What must be acceptance of the elevator? .<BR> As long as the public use of the elevator must be acceptance, the meaning of this concept is only one family member can not use the elevator inspection (Note: you can not acceptance does not mean not acceptance). .2. The concept of a family who is what? .<BR> Not mean a person is just a family man, and if three people, three people this is the family of the staff. .3. Two households shared the elevator is not to acceptance? .<BR> Two shared a public use of the elevator to the elevator, it must be accepted. .Even if Villa is not just an installation to use the elevator to acceptance. .4. Acceptance of users and suppliers of some responsibility for how to distinguish? .<BR> On the contract did not indicate general civil engineering is responsible for supply-side elevator, then certainly by the user, in this part of the elevator inspection does not meet the requirements if the civil engineering, the user must be met and modification. .In addition to civil and acceptance <BR> lift the burden of some of the provisions of the user, the other all the units and installation of elevator manufacturer responsible. .5. Elevator shaft, including those parts of civil engineering? .<BR> Civil engineering including construction of the elevator shaft using the civil construction material quality, including the elevator machine room elevator machine room, embedded parts situation, vertical civil case, the end of pit water and so on. .6. Lift Power: <BR> users the power to pass to the elevator machine room power boxes, machine room less elevator shaft power leads to the top of the wall power supply box. .Power boxes provide the following in part by the elevator. .7. Acceptance of unsatisfactory changes: <BR> an acceptance if the elevator is not qualified, there must be unqualified acceptance of a detailed list of contents, the general responsibility in that regard that the responsibility for improvement. .While the second inspection costs borne by the responsible party big. .8. Elevator inspection and acceptance: <BR> elevator inspection and maintenance cost is generally in consultation by the user commitment. .The annual inspection must be requested in the elevator before. .Maintenance units responsible for inspection must be strict inspections of elevators and repair, until it meets the acceptance requirements..
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment