Wednesday, January 26, 2011

【 Weak current College 】 100 decoration tips (2)



Third, woodworking
53, to the best drying larch keel
54, large wood bought dried after going to sawing
55, woodworking approach to playing the House horizontal lines
56, color Panel came in to buy the paint brush, prevent dirty
57, ceiling fans can't install in ceiling keel
58, color Panel construction to advance pick color
59, suspended ceiling of hanging bar distance wall shall not be greater than 300
60, gypsum board with countersunk head self tapping screws, into the plate surface 1 ~ 2MM and anti-rust treatment, not gun nail
61, gypsum board, the distance between the nails must be no greater than 200
62, gypsum board walls to and 3 joints for crack treatment
63, gypsum board Yang Kok Department preferably done Yang Kok bar protection
64, wooden doors down from emerging Office to paint
65, the bottom of the toilet door set to brush waterproofing
66, door size should be consistent
67, try not to let the wood furniture, do not do good
68, cabinets to buy whole, wood do not design is out
69, the dimensions must be considered good, looks more trouble
70, own movable door do dark orbit, then no way maintenance
71, bathroom small try sliding door, do not open the door, the local
72, unsure of carpentry must communicate with the foreman, never let them up front
73, money in your hand is the clincher
74, with the baby, glass to use less
75, be sure to let workers look drawings
76, kitchen drawer is useful
77, floor joists smoothness is 5MM
78, wool paved floor to 30 ° or 45 °, plates and plate between 2 ~ 3MM, sewn to stagger the
79, floors and walls to leave between 8 ~ 10 mm joints
80, composite floor length exceeds 8M to consider expansion joint
81, use density Board do door set
82, hinges and hardware must use good
83, Yuba to mounted on wood joist, cannot be directly mounted on the ceiling
Fourth, painter
84, dark LaTeX construction try not with water, or prone to chromatic aberration
85, gypsum board joints to bandage
86, walls have gaps to really cool cloth on better
87, original wall some PuTTY preferably eliminate, or brush again glue seal-solid
88, try to buy a brand of paint, decoration companies recommend or foreman recommended no famous try not to use
89, weather, not too wet, paint brushes
90, paint, coating and grinding to completely dry out after
91, next paint construction will have to wait for the first line after the paint dry
92, metal surface oil paint to do anti-rust treatment
93, the weather is too cold, painted the construction quality is poor
94, doors, paint, use masking cleaved hinge and lock
95, it was so hot, it is necessary to pay attention to ventilation
96, wallpaper, the wall brush boiled oils
97, Schimmel, switch, socket panels removed
98, light, light of latex paint to a complete complement of prone to chromatic aberration
99, tijuexian installed PuTTY and latex paint to fill the gap
100, frosted glass to protect the good with newspaper





No comments: