STEP1 develop preliminary renovation plan.
Don't miss the best of central air conditioner installation time
And conventional air conditioning installation methods, design of residential central air conditioning in the rooms of the installed best decor design domestic central air-conditioning before! is the adoption of the "hidden" install mode, its design installation scenarios to overall decoration of the housing programme, otherwise it will have an impact on late-stage decoration. For example, the host can use ceiling (even including the bathroom ceiling) will host the "hidden", so that the overall pattern of housing will be more simple and elegant. Therefore, please be sure to immediately inform decoration designer you have to install a central air conditioning plan.
STEP2 selected brands.
A good brand, not only is the product quality guarantee is a guarantee of service
Household central air conditioner is durable consumer goods, simultaneously also is a "semi-finished", because it combined with the interior decoration. To make a set of domestic central air conditioning system to function properly, the design, installation, construction of the importance of the machine. The following is a selection of domestic central air conditioner brand, you need the key considerations:
Be sure to select the service good, reputable brand to protect their own interests.
Now that is a home with air conditioning, natural to choose a professional manufacturer of residential central air conditioning. And professional development for shopping centres, factories, hotels, etc. larger commercial establishments of manufacturers of commercial central air conditioning, a professional manufacturer of residential central air conditioning in product development, will be more focused on the air conditioning in the energy-saving power, comfort and ergonomic aspects. In addition, there are strong technical development strength, can we truly and matches the "professional", is the best quality and service.
The so-called "third product, seven installation" refers to the central air-conditioning use is good or bad, depends on product quality, design, installation, commissioning, after-sales service, and other aspects. Therefore, choosing a good brand, you also need to have a professional sales installation company. In General, manufacturers specify sales installation company, is your best choice. Because manufacturers will be the system of training, at the same time, the specified sales installation company, also on the brand of product performance, installation requirements, have a deeper understanding, so their installation technology will become more professional, but also more security services.
STEP3 developed air conditioning programme.
Home decoration tips
The ability of domestic central air conditioning, models, the return of air supply mode, remote control, installation location, and so on, are required depending on the room type and user needs and features to develop design decoration. For example: remote control of the way in both wired and wireless, living-general staff to walk more, you can select wired remote control, flexible operation, little bedroom, you can select wireless remote control; in addition, to develop a good air conditioning, air conditioning architects, interior designers and users to third parties full communication is also very important.
Early communication is important. To provide air conditioning designers real-time decoration scheme, all rooms feature distribution information, and as far as possible decoration designers communicate with air-conditioning designers. The model selected. After the above steps, the air conditioning system designers can calculate a air conditioning load value, according to the load value, selected indoor and outdoor machine. Of course, the final selected models, you also need to combine the characteristics of regional climate, the housing itself storey, direction, heat and other factors to consider.
Design the way back to the wind. That is, the air, wind patterns and ceiling moulding on effectively to ensure air conditioning effect, but also guarantees that the House is beautiful. If the ceiling space is large enough, you can use side sent back after; if the ceiling is not enough space, you can use the spacious side sent next time; if you do not consider ceiling form, you can consider using the toilet, and other adjacent space made way back side songce. In addition, reasonable arrangement of the diffuser is also important to take care of the air distribution to all the corners of the room and, more to avoid supply outlet on direct blowing.
Construction design. Apart from the design process, sales will also install the company planned the entire construction design, for example: in order to ensure the effectiveness of the refrigeration, heating, construction design should minimize refrigerant piping length; installed refrigerant piping, you need to have some space left tube and try to avoid wearing beam; drain, condensate pipe should follow the principle of water nearby.
Site survey to determine the final design for air conditioning. Designers and your onsite field survey, the characteristics of your House, installation conditions, air conditioning, power supply
STEP4 contract.
Home decoration tips
To protect your legal rights, you should install the company signed a sales contract of sales. And, to ensure that your progress and duration of decoration, in the decoration beginning 1 ~ 2 weeks before signing the contract, the company is ready to install air conditioning sales and installation materials sufficient period of time. Also, be sure to set aside a certain amount of quality security deposit, in order to safeguard their rights at the time of acceptance.
STEP5 air-conditioning equipment and installation personnel.
Home decoration tips installation considerations
The installer must undergo professional training, there are manufacturers recognised to construction operations.
Indoor lifting, pipeline arrangement, etc., can and other "secret project" hand in hand.
Indoor installation: installation, you must check the model number, name, and whether they are consistent with the design. The installation process, you must accurately locate its installation location, and ensure the level of the installation, to reduce running noise. In addition, indoor Suspender nut anti-loosing measures must exist, and we assure the installation of a security firm. Indoor installation, application of plastic bags, and other decorative unfinished front, not open the plastic bag to prevent dust, otherwise affect future results. Finally, we must pay particular attention to, it is critical that you stay in a outlet for later inspection and repair.
Laying of pipeline: refrigerant pipesAnd drainage pipes, pipe fittings, valves and pipeline are metal parts in contact to insulation wrapped to prevent condensation water dripping, impact of smallpox and other local housing decoration. Copper pipe laying is complete, you must perform pressure and leak test.
Installing outdoor unit: first, to wall drilling, with special attention to prevent rain penetration, pipe through the outer wall must be sealed at the same time in the drilling Department set protection casing; second, the system for vacuum drying, to avoid cooling-performing or system of phenomena such as ice barrier; third, the outdoor unit installed locations to sophisticated cooling ventilation, easy maintenance, at the same location where you want to try to hide, to avoid affecting the House look and noise impacts indoor.
In the outdoor unit around or stand around must be equipped with drainage channels, especially on the roof platform installed, you must pay attention to the waterproofing roof construction, guarantees not leak. Fourth, as the outdoor unit of the fin is exposed on the outside, easily hurt, thus affecting the appearance and use effects, so great care should be taken when installed, such as scratches, abandoned the comb or brush comb.
STEP7 decorating.
Before the start of the decoration, the indoor and outdoor machine packed with a plastic bag to prevent dust, etc., affecting future use. And, in the whole inner decoration is in progress, do not use air conditioners or open indoor and outdoor machine plastic bags.
STEP8 installation Tuyere, final acceptance test run.
Generally a room or Hall need only one outlet, if the living room area is large, or rectangular, with a draught. If you selected the side sent the next time, pay attention to the outlet and the direction of the fan blade back outlet cannot be the same direction, so as to avoid short circuit, cooling/warming effect caused a greater impact.
Home decoration and central air conditioning works after installation, you must be a system of determination and final acceptance test operation (hereinafter referred to as acceptance). System debug at full load and minimum load conditions. Air conditioner unit test run to 1.5 hours.
STEP9.