Tuesday, December 21, 2010
【 Weak current College 】 order detailed decoration
1. the initial design--2. the main body of the demolition--3. hydropower reform--4. carpentry--5. tile--6. brushes the wall paint--7. kitchen ceiling--8. kitchen cabinet Setup--9. wooden doors installed--10. flooring installation--11. paving wallpapers--12. heat sink installation--13. switch socket installation--14. lighting Setup--15. metal ware installation--16. curtain rods installed--17. pioneer cleaning--18. furniture approach--19. home appliances installed--20. home accessories
Decoration, largely in accordance with the 20-step completed. Following the death of her, do my best as we can to keep my current understanding of the renovation process and the process need to be aware of the many details as possible, detailed again ...
The whole process a, decoration of 20 links analysis
(A)-stage design
The same is constructed, and the difference is that bees, bee of reflecting the construction is instinctive, but people in construction, head first into mind and framework. Therefore, if the home compared to a battle, the home of stage design is the battle of the "operational programme", is the home of the "spirit aspect." And so, the death of the last piece of the manufacture of entire article Liang Tang on the stage design issues, it is not repeated here.
In the initial design, students must also do one thing, it's on my room once a detailed measurement, we don't make a lazy, it is best to personally measurement, measurement of content include:
1. clear the area of renovation process involves. Especially the tile floor, walls painted area, wallpapers, floor area;
2. clear the main wall dimensions. Especially after the need to design furniture of wall surface dimensions are placed.
I remember my family foreman last me the amount according to the "actual" settlement paved a total, he measured area than my own measurement of more than 10 square meters area, I was really at a loss. New measurement, the foreman turned back hauled overthe coals for bricklayers said: "How do you measure?!" and this is why I suggest to you the cause of your measurement. The decoration is much the same with the truth in life our lips don't necessarily understand very well, but my heart there must be a number.
(Ii) the principal of the demolition
Access to the construction phase, the body of the demolition was among the first on a major project, including the demolition of walls, masonry wall, shovel wall skin, remove the heater, heat exchanger-steel Windows, etc. Subject demolition bluntly, is the first site framework first tie-up.
(3) transformation of electricity
Shuidian road reconstruction, main structure demolition should basically completed. In the main body of hydropower rehabilitation and demolition between these two links, some students might know, should also be the first of the cupboard is measured. In fact, the so-called Cabinet for the first time measurement is not practical because the walls and floor are not processed, the Cabinet designer is not possible to give a specific design size, but only the developers set aside by the upper nozzle, hood outlet location, make some recommendations. Mainly include:
1. see hood outlet location after the hood are affected by the installation;
2. look at the location of the meter is appropriate;
3, to see whether the position of the nozzle after for later installation of the tank.
For Cabinet's first measurement, a little more experienced students can complete their own. Water renovation complete, the best followed by the bathroom made of waterproof. The kitchen is usually not need to be waterproof.
Have the students have always thought that decoration before you begin, some ingredient should advance the venue. I want to say is, unless it is the main ingredient of demolition is needed, otherwise, such as tiles, emission, the ingredient approach time after renovation in hydropower. Because the circuit modification involving ground grooving, tiles, emission stack location incorrectly, the workers moved to move to it is trouble. The first two days the "mouse" students also mentioned her home with me originally ran workers full House to come back to move bricks, remind students attention.
(4) wood
Carpenters, bricklayers, construction of oil workers is part of the "three brothers". Basic principles of who played dirty who first. "Who dressed the first decision on" is also home to one of the order of one of the fundamental principles, I will mention later.
In fact, like package risers, decorative ceiling, with plaster line such as carpentry, in a sense or as the main link of the demolition of a fine, itself and hydro road reconstruction does not conflict, sometimes also need some support, such as my last post mentioned in the "home for the false wall, to consider whether the false wall electricity lines, if any, should be given improvement of electricity workers of embedded tube. ”
(5) tile
If workers busy opening, foreman in "woodworking boss" is not over when the second "let" bricklayers into play tile, this is normal, because there is no conflict in itself.
In the "second" job of bricklayers, also involves the following three aspects of the installation:
1, scooping stone, marble window of the installation. After installation you can stone and tile together or in tile, marble window sill of the window, set the installation generally do, install marble workers prepare glass glue, smoothly to marble and Windows form glass sealant sealed.
2, floor drain installation. Floor drainer is home hardware in the first stage, as it should and floor tiles together with the installation. Therefore, the students began to stroll around the building, should catch the children buy floor drain.
3 washer,lampblack machine installation. Hood is the first appearance of household electrical appliances, kitchen wall and floor tiles laid out, you can consider installing hood.
The "second" departure bricklayers, then you can about the Cabinet has the second measurement, precisely, in the kitchen wall and floor tiles sticking out and after you install the hood, you can about the second cupboard is measured.
(6) brush wall paint
"Oil industry third" approach, mainly completed wall base processing, brush coat, to "the boss" to play for wood furniture, paint, etc. Students prepare for wallpaper, just need to let the "oil industry third" in plan wallpaper walls do grassroots OfficeRicoh can. As for whether to stay and finally again topcoat, personal feeling this problem didn't need too jiaozhen, decorated from my experience, left over paint's significance is not very large, because the operation does not later than painted dirty.
Write here, death of a breath, and chatting with you. When the "boss" and "second" and "third" successively departure, many students will think your own decoration drawing to a close, in fact, according to the number of links to, one-third less. We have had this feeling is due to the fact that there was a general understanding of the decoration was just renovated "construction link", in fact, the decoration of the "install link" is also the main decoration.
If you said "design" is the future home of the "concept", then "construction link" is our home "packaging", true "provisioning" takes almost all aspects of the "install". Drink, continue ...
(7) the kitchen ceiling
Cabinet ceiling as the installation link led, or extended family "package". Suspended ceiling in the kitchen and bathroom, kitchen and bathroom at the same time as the moisture-proof ceiling lamps, exhaust fan (Yuba) should have bought a ticket. The students had better kitchen ceiling and exhaust fan (Yuba) both installed, or leave out head and opening.
Stopped by a sentence, I am strongly in favour of "decoration outsourcing theory", even though the foreman told me the commitment he has done for hydropower reform workers how to how to spec, aluminum plates installation how to how to behave, how to make wooden doors, wallpaper paste for how to how to create professional, cabinets of how practical ... In my view, the renovation team can do, that is wood, tile, paint
Because I believe that a professional construction, believe that the manufacturers of installation standards, I believe a product of pipelining, mostly than the renovation team to replace the manual gives workers. Decoration like game, soccer is the workers ' skills, so precious in the "my home workers on the construction of genius", I was not practical.
Many students have let decoration companies, renovation team to take on a lot of construction tasks, on the one hand, their time of plenty, another reason is because the connection between "project considered" problem. I had decided to revamp and electricity, and neighbor of outsourcing to remind me: link up a lot of trouble later.
In fact, the decoration of the independence of each link is very strong, remember that recently there are southern students Forum was questioned about his home side, each link are owners please do specialized workers. Home renovations so something, there really is no articulation itself, it is true to say that because the "cohesion", for example involving late wares, lamps, hardware installation and so on who is responsible for the problem, on the one hand you want to see you and workers, at last there is no one like you "tube"; on the other hand, is said to nobody "pipe" to share, I'm still that sentence "since God invented money does not solve the problem."
Decoration, quality is always the sounds are the principal contradiction is a great principle. Certain links in the "convergence" because the problem is minor contradictions. The students in preparing for minor contradictions in contradiction, in principle, make concessions, need to carefully.
(8) kitchen cabinet installation
The ceiling is finished, you can install some cabinet door. Hopefully, oneday can be completed. At the same time there are sinks installed (does not include water supply) and gas stoves, kitchen cabinet Setup before the gas coordination property on the aircooler installed, because the necessary gas test.
(9) the wooden doors installed
In the kitchen cabinet installation on the second day, a month before the doors of measurement is completed, you can now have about installation. Hopefully, one day, while the loading door to install hinges, door locks, sucked. The students should be prepared in advance and related hardware.
If you want to install Windows set of wooden doors manufacturers, pass, at the time of the wooden door manufacturer measurement has to be measured, and wooden doors installed on the same day at the same installation.
Note: in order for the duration of a connection close, to subject demolition finished early doors factory door dimensions measuring with gate. On the heels of processing, we need to note that if the height of the door at home, need workers handling into other high nice.
(10) floor installation
In the doors of the installation of the second day, you can install the floor, hopefully, is also the time of day. Floor installation requires attention to the following questions:
1. before installing the floor, it is best to let manufacturers on-site investigation about the need for leveling the ground or partial levelling, decoration or renovation team will advise students ground levelling screed, or partially, to the actual survey of floor manufacturers;
2. floor prior to installation of pavement flooring, home of the cleaned surface must, in order to ensure that the surface is dry, so do not use water to clean-up process.
3, floor installation, conditional, flooring cutting must be in the corridor. Previous Forum also discussed on this issue, have the students think that pollution in incising floor corridors, public areas, unethical. My idea is finished cleaning, it does not matter. In incising floor on the wall indoor pollution more serious, like there are cabinets of artificial shitai surface cutting, I believe the number of decorated classmates have experience.
(11) paving wallpapers
The floor is installed on the second day, the House clean, they can have some wallpapers paving, hopefully, the same day. Conditional on the day of the paving wallpaper, flooring should do about protection; it's no conditions to clean up the floor to the left of wallpaper glue, I'll put it in the pioneering maintains cleanliness. Paving wallpaper, the wall to try to make a "nothing".
Wooden floor wallpapers, this is a widely recognized correctly install order, first mounted wooden doors in order to ensure that the floor tijuexian and wooden door tightly joins; brachytherapy wallpaper is mainly because the floor installation dirty, dust, serious pollution to the wallpaper. Here again I said "who dressed the first" principle.
Renovation process of successive gradually in a variety of restriction and is restricted by conditions. Occasionally there are exceptions, such asHolzer door need to first install the floor after loading doors, but such exceptions in the renovation process and far.
In addition, I have repeatedly said that "in front of one day", a layer of meaning to remind the students, "day" for the entire decoration is not very long, so even if no installation conflicts, such as cabinets and doors, the students also try not to get in a day's time while booking two installations, particularly for those mentioned above, the "big" because the installation for the "big" is critical, the best designed at a site, rather than "one two." To learn how to comfort myself I missed a day.
(13) switch socket installation
Death of the only sentence reminder: students should be home all natural number of switch socket, location, having a detailed understanding of or record, in particular for wallpaper, wallpaper workers sometimes irresponsible, wallpaper, tiles at Hula him nor wallpapers knife in your switch socket location hole marking. So, still requires the students to know yourself.
(14) the lighting installation
Pack light, nothing to say. Installing your lamps, home light, bid farewell to the decoration period 100-watt incandescent light glare of good feeling.
(15) hardware sanitary installation
Before buying the pipes fittings, bathroom accessories, toilet, drying rack, etc., on all loaded on. Preceding those "heavy" installed, home is still very "cold", wait for the lamp, metal ware installed after home "live", really "live". It is not exaggeration to say that you first open water "concludes at WA, WA" to flow, heart is very beautiful; the first at home new toilet a respectful, great sense of accomplishment and, Yes, I gave it up a good name "Virgo".
(Write here involuntarily from mp3 folder pulls out the light of the first ", this song is good. )
(16) curtain rods installed
Curtain rods installation marks the end of basic home decoration.
(17) the pioneering maintains cleanliness
Pioneering maintains cleanliness before, don't pretend curtains, remember that "explain the curtains" post RI warned us. Pioneering maintains cleanliness, the home do not have furniture and appliances is not required, to keep more of the "plane" for pioneering maintains cleanliness to thorough cleaning.
(18) furniture approach
About furniture buying time, my suggestion is that the best in hydro road reconstruction finished so that selected range of furniture for the basic dimensions are approximate our hearts. Therefore, some students in the decoration hasn't started already anxious before the furniture are booked, personal feeling no need.
(19) the appliance approach
To this time, the entrance of the venue home appliances, the installation setup and ready to live!
Home accessories (20)
Home Accessories, home of the last step, and have been decorated by renovations to, including curtain installation belongs to home accessories. As to buy curtains, preferably after good furniture to avoid style conflicts. Home accessories also includes can consider buying some green plants, wall paintings, furniture and crafts and so on and so on ... In short, after arrival, you are free to play.
Second, the renovation process of two Division
Read the first section of the students may find that disturbing, to make it easier for us to further understand this 20 step as well as some necessary during the entrainment of links, died of a heart in front of the 20 "on the basis of the stars", and added a "Star" 10 as follows:
1 go to start their own measurement procedure 2 3 stage design 4 subject demolition measuring 5 doors factory door 6 cabinets first measuring 7 hydropower reform 8 Toilet water bladewing 10 woodworking 9 ingredient 11 tile (install window sill and floor drain) 12 13 cabinets installed hood second measuring 14 brushes the wall paint 15 kitchen ceiling 16-pass gas 17 cabinet installation (installed at the same time sink, gas cooker) 18 doors installed 19 floor installation 20 paving wallpapers 21 heatsink installation 22 switch socket installation 23 24 metal ware luminaire installation installation 25 curtain rods installed 26 27 pioneering cleaning furniture home installation approach 28 29 30 moving home accessories
(A) renovation of four Division
Thick lines of said that, in accordance with the text of the start of the 20 sectors mentioned, the decoration of the whole process can be divided into the following four steps:
1, design links; (1)
2. construction link, (2-6)
3. install link (7-16)
4. sunset. (17-20)
(B) renovation of six steps divided
Follow the project characteristics, in accordance with the just mentioned by 30 points, the decoration of the whole process can be divided into the following six steps:
Step 1: design ideas; (3)
Step 2: remove the body; (4)
Step 3: built-in works; (7)
Step 4: override works; (10, 11, 14, 15, 19, 20)
Step 5: Install phase; (17, 18, 21, 22, 23, 24, 25)
Step six: closeout phase. (26, 27, 28, 29, 30)
Specific instructions:
1. in order to distinguish it from bees, we first need to have a design idea;
2. subject of the demolition, to keep a stock room completely into the site. The main contents of demolition included above just said "the demolition of walls, masonry wall, shovel wall skin, remove the heater, heat exchanger-steel Windows, etc.", and section carpentry;
3. built-in works, is equivalent to "medical surgery." Built-in works to begin with, that is, we often say, "decoration" of hydropower in advance;
4. cover works, like to house the "dress". Wood window set, pass, bricklayers tile, stone, never seem to window installation, oil-painted wood, tile, these three belong to the Basic project, the rear buckle ceiling, pavement flooring, wallpaper, even after the end of the clothing to wear out;
5, installation phase, the main achievement of complete functionality。 Including: cabinets, wooden doors, radiator, switches, sockets, lamp installation, hardware and fittings, curtain rod ... Each item has a set of functionality;
6, closeout stages, bluntly, is also not constitute "can move in" factors complete.
Through the second Festival "decoration process two Division" analysis, back again to see the first section "decoration process 20 link parsing", students may be easier to understand.
Death of her only as a layman, is my personal understanding of the tips order set out above, do hope to give the students the "behind the decoration of the doubt to the order for reference". The article if there are unresolved or improper, I implore you timely advice, thanks.
Finally, to the owners left a job title 10 road, 10 minutes each question, full score 100 points. Be 80 percent or classmates, decoration order section, you basically mastered.
1. the Cabinet of two on-site measurement at what time?
2, doors, flooring, wallpaper construction sequence?
3. why "decoration, hydropower pilot"?
4, carpenters, bricklayers, order of the oil industry?
5, furniture, household appliances is the earliest time to buy more appropriate?
6, room main structure of the demolition and reconstruction of Hydro Road first?
7. what time the venue more tiles?
8, wooden window set and stone sill that first installed?
9, hardware in the floor drain when installed?
10, do the cleaning time when more appropriate?