Tower installation simple programs
1. the appropriate installation site preselection
Installation of water tower place its weight-bearing and ventilation.
2. pre built cement Foundation, and installation of a water tower support frame
Recommendations, in accordance with the instructions, pre made of concrete or steel frame of the Foundation, and then the water tower bottom pot support mechanisms to build a round box ring, level must be uniform.
3. installation of a water tower water trough and pelvic floor
Will sink in the central building on the water basin perimeter bid to bottom box, water basin inner circle bearing to sink flange on fixed.
4. install the Centre pipe, hose clamp beam centre and surrounding body support frame
Centre pipe to vertically installed in the tank and throat songs and then loaded on the Centre pipe clip, and then adding Wai as bracket.
5. install the heatsink bracket and thermal film
The heatsink bracket clamp connection, worlds Centre throat, but must ensure that the level of the vertical. Check all components with a good, all the screws to tighten up and put it into the combined thermal film.
Note: If you want to step on other equipment installed, first to a temporary wooden mats in the heatsink on the bracket.
6. install shell surrounding the body and ladder
The shell surrounding the body placed in the surrounding body brackets, and then around the heatsink Assembly and tighten the screws, and then install in advance specifying the location of the ladder.
7. install the nozzle, tube gear and water jet pipe
The nozzle mounted on the Centre pipe top, then hanging pipe appliances set on top of the head, and then push the sprinkler pipe cross, use prepared within the nozzle hanger tube steel cord for tension control until the sprinkler pipe into a horizontal position, vertical water roar to and into 10 degrees backward installation (at run time, the demand for final adjusting angle, see open company proposed speed)
8. install the motor, motors and fans
Motor frame horizontal mounted at the top of the surrounding body shell, and then drop again jinmada and reducer with fan combination, and finally coupled with the fan-NET.
Note:
1.BR-40 following towers to advance motor, motor bracket attached fan combination is installed.
2.BR-80 fan angle can be adjusted in accordance with the needs of the air flow and.
9. seal water basin and surrounding body joints between
Due to the water tower is one of the multiple modular, so after installation is complete, you need to prepare for the fibre drop between seam sealed sauce.
10. install the overtopping, floating ball combo and water across the network
Water will be spilled, floating ball combo and water trap nets placed in a preset, in the throat Dental Medicine Office tap on the desired package adhesive plaster.
11. the installation into the air outlet network
Will a plastic hooks on the bottom shell surrounding the body, the plastic hook under the bottom bowl box, and then drag the return air network install, if found to have little in the way. It can be cut off.
Tower Essentials reinforcing chassis construction
1. lamination before:
A) lamination Department must remain free of dust and damp.
B) resin and hardener of harmonic: amount each time harmonic 1 kg is best, do not exceed 2 kg, used to increase the use of a scale of 1 kg of resin, used 10c.c hardener.
2. fitting methods:
A) spent hair brush blending fine resin, glass, and then after the plaster coating resin, repeated two to three times.
3. considerations:
A) lamination Department need 6 hours before it can be used, not exert pressure and trample.
B) glass fiber is not wet before use, such as wet must be dried before use.